ProofSync

Job completion sync — contractor system → client CAFM

DEMO MODE
Back to jobs

Concerto reference

CON-284721

Joblogic ID

JL-48460

Site

Northgate Depot, Lincoln

Sync status

Synced

Security — realign shutter, loading bay

Northgate Depot, Lincoln — see Concerto recordMark TaylorCompleted 4 Jul 2026, 13:30

Sync to Concerto

This job has already been synced. Running again will re-apply the current Joblogic values.

Joblogic — source (now)

Completion notes

Works completed as scheduled. No follow-on required.

Work completed

Security — realign shutter, loading bay — completed and tested. Site left clean and safe.

Time on site

75

Arrival time

2026-07-04T12:00:00.000Z

Departure time

2026-07-04T13:15:00.000Z

Completion date

2026-07-04T13:30:00.000Z

Follow-on work

No

Contractor cost

210

Concerto — target

Completion notes

Works completed as scheduled. No follow-on required.

Already matches

Work completed

Security — realign shutter, loading bay — completed and tested. Site left clean and safe.

Already matches

Time on site

1.25

Already matches

Arrival time

Currently blank

Will update

Departure time

Currently blank

Will update

Completion date

2026-07-04T13:30:00.000Z

Already matches

Follow-on work

No

Already matches

Contractor cost

Currently blank

Excluded by rule